Finally, unbolt and remove the fixing angles, chassis, or foundation anchors if applicable. 6. Health, Safety, and Environment (HSE) 6.1 Critical Hazards and Mitigation Measures
Slowly maneuver the jib away from the tower structure and lower it to the designated ground storage area for further disassembly. Step 5.4: Remaining Counter-Weight & Counter-Jib Removal tower crane dismantling method statement
Before any bolt is loosened or section lifted, a thorough pre-dismantling audit must be completed and documented. Finally, unbolt and remove the fixing angles, chassis,
While specific sequences vary by manufacturer and crane type, a standard method statement outlines a logical progression, often involving these phases: Phase A: Securing the Structure unbolt and remove the fixing angles
A dedicated radio channel must be maintained between the assist crane operator, the tower crane technician, and the banksman. Stability: