--- Epcos Power Factor Controller Br 5016 Manual Pdf Direct
Connect the protective earth (PE) terminal to the main panel ground busbar.
Set the discharge/re-connection delay time. Warning: Never set this lower than 40–60 seconds unless using thyristor switched modules, as capacitors need time to discharge before safely re-energising. --- Epcos Power Factor Controller Br 5016 Manual Pdf
Incorrect wiring phase relationship between CT and voltage inputs. Connect the protective earth (PE) terminal to the
The power factor enters a leading state ( --- Epcos Power Factor Controller Br 5016 Manual Pdf
Graphical indicators show which steps are currently active, locked, or faulty. 5. Troubleshooting and Alarm Codes
Output commands to capacitor contactors and communication ports.
Out of the box, the controller may not match your specific capacitor bank setup. The manual guides you through programming critical parameters such as: